PRIMACH Series Batching Plant Has Been Erected in UAE for 14 Years
- Share
- Issue Time
- Aug 26,2021
Summary
PRIMACH equipment located in UAE, it has been erected there withstands high temperature more than 45 degrees for 14 years.
It's absolutely amazing, both batching plant quality and good-looking are good for such a long time. How does it get the jobs done?
PRIMACH equipment located in UAE, it has been erected there withstands high temperature more than 45 degrees for 14 years. It joined UAE construction project of the first express highway, therefore, PRIMACH’s undeniable“Made in China” influence on the local area. Although this asphaltplant has been moved to 4 job sites, it has produced total 1,800,000 tons’ asphalt mixture without any accident, perfectly meet our customers’ needs and be trusted in PM’s superior product quality.
It's absolutely amazing, both batching plant quality and good-looking are good for such a long time. How does it get the jobs done?