PM's Asphalt Plant with High Energy Saving
- Share
- Issue Time
- Apr 15,2021
Summary
Energy saving? With PM it is possible, developed and designed for keeping the operational costs at the lowest level.
Energy saving? With PRIMACH it is possible, developed and designed for keeping the operational costs at the lowest level.
1) Savings in heat loos from gases due to total duct insulation from dryer to baghouse
2) Saving in energy for drying with baghouse filter placed directly above drum
3) Savings in energy and maintenance with recovered fines silo fed by gravity from baghouse filter above
Long-lasting roads and energy savings are the main considerations of road constructors today. The composite materials have to be suitable for all types of recycling and modern low-energy formulas, and at the same time they have to be adaptable to all recent technical developments for producing low cost asphalt.